Project facts
- Site
- Deighton station, West Yorkshire
- Programme
- Transpennine Route Upgrade
- Crane visits
- Two visits across 24-hour shifts
- Cranes
- Grove GMK5120L and Grove GMK5250XL
- Second visit set-up
- 80 tonnes of counterweight and 15 m² outrigger mats
Supporting the Deighton station rebuild
Deighton is part of the Transpennine Route Upgrade. The station scheme includes longer platforms, four tracks through the station and a footbridge with lifts for step-free access between the platforms.
Transpennine Route Upgrade project overview · Network Rail’s station rebuild announcement
Two crane visits, one trackside programme
Before each visit we agreed a crane position beside the tracks and a working window with the station team.
Visit one · Grove GMK5120L
We brought a Grove GMK5120L to the station for the first visit.
Visit two · Grove GMK5250XL
On the second visit, we rigged a Grove GMK5250XL adjacent to the tracks with 80 tonnes of counterweight and 15 m² outrigger mats.
Fitting the lifts around railway operations
We worked with the site team across 24-hour shifts, scheduling crane set-up and lifting around railway operations.
Explore railway crane hire and contract lifting.
Quote for a Similar LiftPlanning a similar station lift
For another station project, mark the permitted work area and site access on a drawing. Tell us who will confirm the railway protection arrangements and how the landing point will be handed back. Conditions shown in the Deighton photographs are specific to that site.
Load Routes & Exclusion Zones