Complex lifting operations

Discuss a tandem lift, a machinery installation with limited headroom or work that must fit a factory shutdown.

The service

Tandem lifts, restricted access and shutdown work

Headroom can matter as much as load weight when installing machinery indoors. A long load may need to pass through several work areas, and a tandem lift involves coordinating more than one crane. Tell us what makes your project unusual so our Appointed Person can review the scope with your team.

What to include in your enquiry

Send the load drawing, weight and dimensions, pick-up and landing positions, and the supplier’s installation sequence. Tell us which other trades share the work area and when the area will be available.

Planning a tandem lift

Two cranes sharing a load need a plan that accounts for how the load can shift between the cranes during the lift. The Appointed Person considers the centre of gravity, lifting points, crane positions and sequence. The briefing establishes who directs the operation and how either operator can call a stop.

Tandem Lift Planning

Let’s plan your next lift

Send your site postcode or town, your preferred date and what you need to lift.

CallGet a Quote