CHP engines, pumps and mixers
Tell us which unit is coming out and what will replace it. For a combined heat and power (CHP) engine, a digester mixer or a skid-mounted pump, the outgoing and replacement units may have different weights or lifting points. Send the supplier’s drawings for both and tell us when the maintenance team needs the area back.
Tank-top equipment and biomethane upgrades
For equipment on top of a tank or a gas-upgrading skid, show us the vehicle entrance, proposed unloading point and final position on a site layout. Include pipe bridges, tanks and other structures between them. We can arrange a site survey and discuss crane hire or a managed contract lift.
Plan the crane visit around the shutdown
Give us the shutdown dates, operating restrictions and the site coordinator’s contact details. We can then agree the order of lifts with your engineers and identify where the vehicles collecting and delivering plant can stand.
Explore Managed Contract LiftingLifting at an operating biogas plant
For a mixer or CHP engine change, ask the plant operator to identify hazardous areas, permit requirements, agreed isolations and any limits on vehicle or crane access. Agree who will release the area for work and who will return it to operations after handover.
Load Routes & Exclusion Zones