Steel beam lifts for extensions and structural alterations
For a single beam, send its length, weight and the engineer’s drawing showing the final position. Photographs of the delivery point, building and approach help us discuss access with your builder or steel erector before the delivery lorry arrives.
What size is each lift?
Send the erection drawing and member schedule with the length and weight of each piece. If any steel will arrive as an assembly, mark it on the drawing and give its assembled weight and dimensions.
Agree the delivery order and erection sequence
Tell us whether the steel is going straight from the delivery vehicle into position or being set down for later erection. Include the bays due on each shift and any dates shared with decking, roofing or other trades. We can discuss an all-terrain crane and whether you require crane-and-operator hire or contract lifting.
Compare All-Terrain CranesHanding a beam over to the erectors
Share the erection drawing, piece marks and any steel arriving preassembled. The lift planner and erection team need to agree the landing position, how the member will be secured and who confirms it is ready for release.