Where does the installer take over?
Mark where the crane will pick up the machine and where the installer needs it. If the machine is going inside, send the doorway width and height, a layout and photos of the route from the delivery vehicle. We can then discuss whether a spider crane or tracked carrier is suitable for the indoor move.
Tell us when production needs to restart
If production stops for a fixed shift, tell us when the outgoing machine will be released and when the new equipment is due. Provide separate weights and drawings for the old and new units, along with details of anything that will travel separately. This helps us agree the lifting scope with your nominated site contact.
At a manufacturing site in Derbyshire, a Liebherr crane placed a new machine alongside existing plant. See the site photograph and Alfreton machinery lift.
If the machinery arrives during a shutdown and your site needs us to plan and supervise the offload, see what’s included in managed contract lifting. For the move inside the building, see our factory relocations and machinery moves.
Changing a pump, mixer or CHP engine at an anaerobic digestion plant? See crane hire for biogas plants for the details we need about the outgoing unit, its replacement and the shutdown window.
See the Northampton paper machinery installation.
Book a Machinery Lift SurveyAgreeing a machinery lift during a shutdown
Identify who isolates the machine, who confirms it is free for lifting and who receives it after the move. Check the weight in its transport condition and provide the supplier’s lifting points, particularly where an assembly has been partly dismantled.
Load Routes & Exclusion Zones